Your cart is currently empty |
As Keith Walking Floor Service Agents we are here to help. Keith Walking Floor equipment is extremely robust and reliable and we see very little product failure out of the box. However, running constantly with 27 tonne payloads and heavy impact loading, attrition on the systems can be very high. Indeed Keith Running Floor II with their steel floor and landfill floors take a battering and will need refurbishing periodically. On hot asphalt a steel floor may last 6 years or need floor plank end replacing at 4 years.
Accurate fault finding and diagnostics is important to getting your equipment back working again. It is not always possible to clearly identify problems at a distance. With our well sited service workshops at Milton Keynes – just 200 meters from Junction 13 of the M1 – we aim to help you on your way. We have 8 fully trained technicians who are highly experienced Keith Walking Floor and Running Floor trouble shooting. Our team is supported by Mark Allen of Keith in the UK and then onto Keith Oregon if it all gets very head scratchy.
We can perform small replacement operations at short notice – cylinders, valves etc all the way to a complete trailer rebuild. Our Keith Parts team fit several floor systems each month. We aim to strip out old floor planks, wash and replace with a complete new floor in the shortest possible times.
Our Keith Floor team can prepare and supply new floor revision kits for your trailer. With the correct measurements our team can drill, countersink, seal and put end caps into a replacement floor set in preparation for you. This can take 10 hours of expert work out of your floor replacement and help you avoid the frustration of tedious measurements and incorrect drilling. We can supply a revision kit complete with new floor bearers and side planks for you to fit. Just call and speak to parts for advice.